One of 2 filings for this project. The project's main page, with every filing and where each stands: Ordinary Sand Mining from Riverbed Of Ghaghra/Saryu River, Village- Majha Fareedpur…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Feb 2023 |
| Application filed | 14 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Bablu |
| Land area | 25.9 acres (10.5 ha) |
| Project cost | ₹64 lakh |
| Village / locality | Faredpur Tappa Habeli |
| Taluk / tehsil | Allapur |
| District | Ambedkar Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01097 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Sept 2023 | Environmental approval granted | 25.9 acres | ₹64 lakh |
| Early planning filed 14 Feb 2023 (this page) | Cleared for impact study | 25.9 acres | ₹64 lakh |
In context
12 applications in Ambedkar Nagar since January 2022 are in the same category (Mining): 7 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. At 25.9 acres, this one is larger than 75% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Faredpur Tappa Habeli, Allapur, Ambedkar Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Sand Mining from Riverbed Of Ghaghra/Saryu River, Village- Majha… — environmental approval granted, 0 m away
- Ordinary Sand Mine, Gata No. 01 Mi, lease area-7.5 ha., Village–Isauri… — environmental approval granted, 5.4 km away
- Ordinary Sand Mine — environmental approval granted, 6.1 km away
- Riverbed Sand Mining on the Riverbed of Ghaghara River at Gata No. 390 Ma Mi,… — initial checks, 6.1 km away
- "Ordinary sand Mining" from Riverbed of Ghaghara River — under environmental review, 7.1 km away
- Ordinary Sand Mine, Gata No. 01 Mi, lease area-7.5 ha., Village–Isauri… — cleared for impact study, 15.5 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 19.9 km away
- pROPOSED IOCL Retail Outlet on Tanda-Azamgarh Road NH-233 (New NH-28) in Km.… — forest land use approved, 24.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.