| Official title | Proposed 200 KLPD Grain based Ethanol Plant & 4.9 MW Cogeneration Power Plant under Ethanol Blending Programme at Village Khamariya Pandit, Tehsil Dhaurahara, District Lakhimpur Kheri, Uttar Pradesh by M/s Zuari Envien Bioenergy Pvt. Ltd. |
|---|---|
| Status | Environmental approval granted |
| Status since | 2 Jan 2024 |
| Application filed | 4 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Zuari Envien Bioenergy Private Limited |
| Land area | 20 acres (8.1 ha) |
| Project cost | ₹175 crore |
| Village / locality | Khamariya Pandit |
| Taluk / tehsil | Dhaurahara |
| District | Kheri |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01122 |
In context
14 applications in Kheri since January 2022 are in the same category (Industry): 13 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 20 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khamariya Pandit, Dhaurahara, Kheri, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Earth Mine", Village- Hardaspur, Gata No.- 88मि, Area- 4.1590 Ha.,… — environmental approval granted, 1.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 4.7 km away
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-II)… — initial checks, 10.7 km away
- "Ordinary Earth Mine", Village- Ravahi, Gata No.- 202 Mi & 213, Lease Area-… — environmental approval granted, 22.5 km away
- Ordinary Earth Mine", Village- Katiya, Gata No.- 133, Area- 0.813 Ha., Tehsil-… — lapsed, 25.8 km away
- "Ordinary Earth Mine", Village- Mohammadpur Kaimahara, Gata No.- 211, 259, 270… — environmental approval granted, 26.1 km away
- "Ordinary Sand Mining" from Riverbed of Sharda River — environmental approval granted, 26.1 km away
- "Ordinary Sand Mining" from Riverbed of Sharda River — cleared for impact study, 26.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.