Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Aug 2023 |
| Application filed | 14 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Chambal Tradings Private Limited |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹655.4 crore |
| Village / locality | M a K a N P U R |
| Taluk / tehsil | Ghaziabad |
| District | Ghaziabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01169 |
In context
154 applications in Ghaziabad since January 2022 are in the same category (Buildings & townships): 95 approved, 43 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.9 acres, this one is larger than 79% of them.
52 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
M a K a N P U R, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion & Revision in Proposed IT/ITES Park At Plot no. A-37-38, Sector-62,… — cleared for impact study, 0 m away
- Building project by R and R Tech Mach Limited — lapsed, 200 m away
- I.T & I.T.E.S Development in Sector-62, Noida — under environmental review, 200 m away
- I.T & I.T.E.S Development in Sector-62, Noida — withdrawn, 200 m away
- Building project by R and R Tech Mach Limited — withdrawn, 200 m away
- Proposed IT/ITES Project — under environmental review, 1.2 km away
- Proposed Group Housing Project [Type-E] at Plot No.10 (10/2), Vaibhav Khand,… — environmental approval granted, 1.3 km away
- Proposed Institutional Building Project at Plot No. A-2, Sector-62, Noida,… — environmental approval granted, 1.4 km away
More from Chambal Tradings Private Limited in Ghaziabad
- Expansion & Revision in Proposed IT/ITES Park At Plot no. A-37-38, Sector-62,… — cleared for impact study
- Expansion & Revision in Proposed IT/ITES Park At Plot no. A-37-38, Sector-62,… — cleared for impact study
All 3 Chambal Tradings projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.