Cleared for impact studyMining · Sonbhadra, Uttar Pradesh

Area 1.9829 Ha Gitti Boulder (Sandstone) Mining Project Araji no. 282Mi [Khand 3] Village-Sukrit, Tehsil-Robertsganj , District-Sonbhadra, Uttar Pradesh.

Area 1.9829 Ha Gitti Boulder (Sandstone) Mining Project Araji no. 282Mi [Khand 3] Village-Sukrit, Tehsil-Robertsganj , District-Sonbhadra, Uttar Pradesh is a proposed mining project in Sukrit, Robertsganj, Sonbhadra, Uttar Pradesh. The site covers 4.9 acres. Its stated project cost is ₹1.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 May 2023).

See it on the live map All projects in Sonbhadra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Area 1.9829 Ha Gitti Boulder (Sandstone) Mining Project Araji no. 282Mi [Khand 3]…

Project details

StatusCleared for impact study
Status since6 May 2023
Application filed6 May 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSarveshwari Infratech Private Limited
Land area4.9 acres (2 ha)
Project cost₹1.3 crore
Village / localitySukrit
Taluk / tehsilRobertsganj
DistrictSonbhadra
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01216

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Nov 2023Environmental approval granted4.9 acres₹1.3 crore
Early planning filed 6 May 2023 (this page)Cleared for impact study4.9 acres₹1.3 crore

In context

209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.9 acres, this one is larger than 56% of them.

6 other mining leases have applied within 500 m of this site; together with this one they cover 30.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 29 mining leases have applied within 5 km.

Where it is

Sukrit, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.