What is Developing? Open the mapMap

Cleared for impact studyMining · Banda, Uttar Pradesh

"Sand/Morrum Mine" from Riverbed of Ken River

"Sand/Morrum Mine" from Riverbed of Ken River is a proposed mining project in Laraka Purwa, Banda, Uttar Pradesh. The site covers 59.3 acres. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 6 Dec 2023).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mine" from Riverbed of Ken River?

"Sand/Morrum Mine" from Riverbed of Ken River is a proposed mining project in Laraka Purwa, Banda, Uttar Pradesh. The site covers 59.3 acres.

Who is building it?

The applicant is Ansh Project Service.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 6 Dec 2023), as of 27 Nov 2026.

Where is it?

In Laraka Purwa, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.2 crore and a site of 59.3 acres.

When was it filed?

The application was filed on 6 Dec 2023.

One of 3 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mine" from Riverbed of Ken River

Project details

Official title"Sand/Morrum Mine" from Riverbed of Ken River at Village- Kanwara, Gata No.- Part of 337 (Khand No.- 03) Lease area- 24.00 ha. (59.30 Acre), Tehsil- Banda, District- Banda Uttar Pradesh, Project Proponent- M/s Ansh Project Service (Partner- Shri Vivek Singh)
StatusCleared for impact study
Status since6 Dec 2023
Application filed6 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAnsh Project Service
Land area59.3 acres (24 ha)
Project cost₹1.2 crore
Village / localityLaraka Purwa
Taluk / tehsilBanda
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01259

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Sept 2026Initial checks59.3 acres₹1.2 crore
Amendment filed 24 Feb 2026Cleared for impact study59.3 acres₹1.2 crore
Early planning filed 6 Dec 2023 (this page)Cleared for impact study59.3 acres₹1.2 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 59.3 acres, this one is larger than 87% of them.

No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.

Where it is

Laraka Purwa, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Ansh Project Service projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.