Quick answers
What is "Sand/Morrum Mine" from Riverbed of Ken River?
"Sand/Morrum Mine" from Riverbed of Ken River is a proposed mining project in Laraka Purwa, Banda, Uttar Pradesh. The site covers 59.3 acres.
Who is building it?
The applicant is Ansh Project Service.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Dec 2023), as of 27 Nov 2026.
Where is it?
In Laraka Purwa, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 59.3 acres.
When was it filed?
The application was filed on 6 Dec 2023.
One of 3 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mine" from Riverbed of Ken River
Project details
| Official title | "Sand/Morrum Mine" from Riverbed of Ken River at Village- Kanwara, Gata No.- Part of 337 (Khand No.- 03) Lease area- 24.00 ha. (59.30 Acre), Tehsil- Banda, District- Banda Uttar Pradesh, Project Proponent- M/s Ansh Project Service (Partner- Shri Vivek Singh) |
|---|---|
| Status | Cleared for impact study |
| Status since | 6 Dec 2023 |
| Application filed | 6 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ansh Project Service |
| Land area | 59.3 acres (24 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Laraka Purwa |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01259 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Sept 2026 | Initial checks | 59.3 acres | ₹1.2 crore |
| Amendment filed 24 Feb 2026 | Cleared for impact study | 59.3 acres | ₹1.2 crore |
| Early planning filed 6 Dec 2023 (this page) | Cleared for impact study | 59.3 acres | ₹1.2 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 59.3 acres, this one is larger than 87% of them.
No other mining lease on record is within 500 m of this site; 13 have applied within 5 km.
Where it is
Laraka Purwa, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mine" from Riverbed of Ken River — initial checks, 0 m away
- "Sand/Morrum Mine" from Riverbed of Ken River — cleared for impact study, 0 m away
- Sand/Morrum Mining Projects from Riverbed of Ken River — lapsed, 750 m away
- Kanwara Sand/Morrum Mining Project (Block No.- 11, Area 23.0 Ha.) — lapsed, 900 m away
- Proposed Project of "Sand/Morrum Mining" at Gata No. 431/1 (Khand No. 05),… — under environmental review, 1.3 km away
- Riverbed Sand/Morrum Mining having lease area 10.70 ha along River Ken in Gata… — under environmental review, 2.2 km away
- Proposed Project "Morrum Mining" at Gata No. Part of 1130 (Khand No. 02), Area… — initial checks, 2.7 km away
- Proposed Project "Morrum Mining" at Gata No. Part of 1130 (Khand No. 02), Area… — under environmental review, 2.7 km away
All 3 Ansh Project Service projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.