Quick answers
What is this project?
Building Stone, Khanda, Boulder, Ballast (Gitti) Mining Project is an approved mining project in Kabrai, Mahoba, Uttar Pradesh. The site covers 7 acres.
Who is building it?
The applicant is Pradeep Raghuwanshi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Dec 2023), as of 27 Nov 2026.
Where is it?
In Kabrai, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2 crore and a site of 7 acres.
When was it filed?
The application was filed on 2 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Dec 2023 |
| Application filed | 2 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pradeep Raghuwanshi |
| Land area | 7 acres (2.8 ha) |
| Project cost | ₹2 crore |
| Village / locality | Kabrai |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01262 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7 acres, this one is larger than 90% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 14.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Kabrai, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Khanda, Gitti, Boulders)" Project at Gata No.- 967 (Khand… — environmental approval granted, 150 m away
- "Building Stone (Khanda, Gitti, Boulders)" Project at Gata No.- 967 (Khand… — cleared for impact study, 150 m away
- "Building Stone (Khanda, Gitti, Boulder)" Project at Gata No.- 323 Khand No -… — cleared for impact study, 1.3 km away
- Building Stone Granite, Khanda, Boulder, Ballast, Gitti Mining Project — environmental approval granted, 1.3 km away
- "Building Stone (Khanda, Gitti, Boulder)" Project at Gata No.- 323 (Khand No -… — cleared for impact study, 1.4 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 1.5 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 1.5 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.