What is Developing? Open the mapMap

Cleared for impact studyMining · Ayodhya, Uttar Pradesh

"Ordinary Sand Mining" from Riverbed of Ghaghra River

"Ordinary Sand Mining" from Riverbed of Ghaghra River is a proposed mining project in Mohsaria Majha, Faizabad, Ayodhya, Uttar Pradesh. The site covers 25 acres. Its stated project cost is ₹98 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 18 Dec 2023).

See it on the live map All projects in Ayodhya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Ordinary Sand Mining" from Riverbed of Ghaghra River?

"Ordinary Sand Mining" from Riverbed of Ghaghra River is a proposed mining project in Mohsaria Majha, Faizabad, Ayodhya, Uttar Pradesh. The site covers 25 acres.

Who is building it?

The applicant is Awadh Pandey.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 18 Dec 2023), as of 27 Nov 2026.

Where is it?

In Mohsaria Majha, Faizabad, Ayodhya, Uttar Pradesh.

How big is it?

It has a stated cost of ₹98 lakh and a site of 25 acres.

When was it filed?

The application was filed on 18 Dec 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand Mining" from Riverbed of Ghaghra River

Project details

Official title"Ordinary Sand Mining" from Riverbed of Ghaghra River at Village- Majha Sitarampur, Gata No.- 109/07, Lease Area- 10.125 ha., Tehsil- Harraiya, District- Basti, Uttar Pradesh, Project Proponent- Shri Awadh Narayan Pandey
StatusCleared for impact study
Status since18 Dec 2023
Application filed18 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAwadh Pandey
Land area25 acres (10.1 ha)
Project cost₹98 lakh
Village / localityMohsaria Majha
Taluk / tehsilFaizabad
DistrictAyodhya
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01288

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Aug 2024Environmental approval granted25 acres₹98 lakh
Early planning filed 18 Dec 2023 (this page)Cleared for impact study25 acres₹98 lakh

In context

57 applications in Ayodhya since January 2022 are in the same category (Mining): 42 approved, 13 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 25 acres, this one is larger than 88% of them.

No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.

Where it is

Mohsaria Majha, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.