Quick answers
What is "Ordinary Sand Mining" from Riverbed of Ghaghra River?
"Ordinary Sand Mining" from Riverbed of Ghaghra River is a proposed mining project in Mohsaria Majha, Faizabad, Ayodhya, Uttar Pradesh. The site covers 25 acres.
Who is building it?
The applicant is Awadh Pandey.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Dec 2023), as of 27 Nov 2026.
Where is it?
In Mohsaria Majha, Faizabad, Ayodhya, Uttar Pradesh.
How big is it?
It has a stated cost of ₹98 lakh and a site of 25 acres.
When was it filed?
The application was filed on 18 Dec 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand Mining" from Riverbed of Ghaghra River
Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ghaghra River at Village- Majha Sitarampur, Gata No.- 109/07, Lease Area- 10.125 ha., Tehsil- Harraiya, District- Basti, Uttar Pradesh, Project Proponent- Shri Awadh Narayan Pandey |
|---|---|
| Status | Cleared for impact study |
| Status since | 18 Dec 2023 |
| Application filed | 18 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Awadh Pandey |
| Land area | 25 acres (10.1 ha) |
| Project cost | ₹98 lakh |
| Village / locality | Mohsaria Majha |
| Taluk / tehsil | Faizabad |
| District | Ayodhya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01288 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Aug 2024 | Environmental approval granted | 25 acres | ₹98 lakh |
| Early planning filed 18 Dec 2023 (this page) | Cleared for impact study | 25 acres | ₹98 lakh |
In context
57 applications in Ayodhya since January 2022 are in the same category (Mining): 42 approved, 13 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 25 acres, this one is larger than 88% of them.
No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.
Where it is
Mohsaria Majha, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — environmental approval granted, 0 m away
- "Manjha Barhata Ordinary Sand Mine Private Land on Riverbed of Ghaghara River" — under environmental review, 1 km away
- "Manjha Barhata Ordinary Sand Mine Private Land on Riverbed of Ghaghara River" — cleared for impact study, 1 km away
- Ordinary Sand Mine — initial checks, 1.2 km away
- Ordinary Sand Mine — cleared for impact study, 1.2 km away
- River Bed Sand/Morrum Mining Project of Shri Gyanchand Jaiswal Village -… — returned to applicant, 1.8 km away
- "Ghaghra Riverbed Ordinary Sand Mine" Village- Manjha Rampur Halwara (Gata… — environmental approval granted, 1.8 km away
- Ordinary Sand Mine — initial checks, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.