Quick answers
What is this project?
Building stone (Sandstone) Project at Gata No.-3 Kha, Village– Manikpur, Tehsil-Lalganj, District–Mirzapur, Uttar Pradesh is an approved mining project in Manikpur, Lalganj, Mirzapur, Uttar Pradesh. The site covers 3.9 acres.
Who is building it?
The applicant is Rama Mishra.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Sept 2023), as of 27 Nov 2026.
Where is it?
In Manikpur, Lalganj, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹78 lakh and a site of 3.9 acres.
When was it filed?
The application was filed on 30 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Sept 2023 |
| Application filed | 30 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rama Mishra |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹78 lakh |
| Village / locality | Manikpur |
| Taluk / tehsil | Lalganj |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01355 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 | Cleared for impact study | 3.9 acres | ₹78 lakh |
| New project filed 30 Sept 2023 (this page) | Environmental approval granted | 3.9 acres | ₹78 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.9 acres, this one is larger than 61% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 20.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Manikpur, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building stone (Sandstone) Project at Gata No.-3 Kha, Village– Manikpur,… — cleared for impact study, 0 m away
- "Building Stone (Sandstone)" Mine from Village- Manikpur, Gata No.- 3ख, Lease… — environmental approval granted, 150 m away
- "Building Stone (Sandstone)" Mine from Village- Manikpur, Gata No.- 3ख, Lease… — cleared for impact study, 150 m away
- Building stone (Sandstone) Project at Gata No.- 3 Gha, Village– Manikpur,… — cleared for impact study, 350 m away
- Building stone (Sandstone) Project at Gata No.- 3 Gha, Village– Manikpur,… — environmental approval granted, 350 m away
- "Building Stone Sand Stone" Project at Gata No.- 615ka & 615/692 Mi , Village-… — environmental approval granted, 1.6 km away
- "Building Stone Sand Stone" Project at Gata No.- 615ka & 615/692 Mi , Village-… — cleared for impact study, 1.6 km away
- "Building stone (Sandstone)" Project at Arazi No.- 307/4, Village– Kamapur… — environmental approval granted, 7.5 km away