What is this project?
"Building stone (Sandstone)" Mine at Gata No.- 997 Mi, lease area- 3.237 ha, Village– Sindhora, Tehsil- Sadar, District– Mirzapur, Uttar Pradesh developed by M/s Jai Maa Bhandari Stone Works (Shri Gulab Das) is an approved mining project in Sindhaura, Mirzapur, Uttar Pradesh. The site covers 8 acres.
Who is building it?
The applicant is Gulab Das.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 May 2023), as of 27 Nov 2026.
Where is it?
In Sindhaura, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 8 acres.
When was it filed?
The application was filed on 6 May 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 May 2023 |
| Application filed | 6 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gulab Das |
| Land area | 8 acres (3.2 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Sindhaura |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01363 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 8 acres, this one is larger than 88% of them.
13 other mining leases have applied within 500 m of this site; together with this one they cover 95.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 21 mining leases have applied within 5 km.
Where it is
Sindhaura, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Sandstone) Mine" at Gata No.- 997 Mi (01), Lease area- 2.23… — under environmental review, 100 m away
- "Building Stone (Sandstone) Mine" at Gata No.- 997 Mi (01), Lease area- 2.23… — cleared for impact study, 100 m away
- BUILDING STONE(SANDSTONE) MINE by SMT. USHA DEVI — environmental approval granted, 150 m away
- Proposed building stone (Gitti, Boulder, Patiya) sandstone mine at Gata No.… — environmental approval granted, 250 m away
- Proposed building stone (Gitti, Boulder, Patiya) sandstone mine at Gata No.… — cleared for impact study, 250 m away
- Area- 4.858 Ha Building Stone (Sandstone) Mining Project — lapsed, 300 m away
- Area- 4.858 Ha Building Stone (Sandstone) Mining Project — cleared for impact study, 300 m away
- "Building Stone Sand Stone" Project at Gata No.- 997Mi , Village- Sindhora,… — environmental approval granted, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.