Quick answers
What is this project?
Building stone, Khanda, Boulder, Balast (Gitti) (Granite) project is an approved mining project in Daharra, Mahoba, Uttar Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Jainendra Singh Contracter.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 May 2025), as of 27 Nov 2026.
Where is it?
In Daharra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 1 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 May 2025 |
| Application filed | 1 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jainendra Singh Contracter |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Daharra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01392 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Feb 2025 (this page) | Environmental approval granted | 2.5 acres | ₹80 lakh |
| Early planning filed 18 Sept 2023 | Cleared for impact study | 2.5 acres | ₹80 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 76% of them.
20 other mining leases have applied within 500 m of this site; together with this one they cover 67.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 37 mining leases have applied within 5 km.
Where it is
Daharra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building stone, Khanda, Boulder, Balast (Gitti) (Granite) project — cleared for impact study, 0 m away
- "Building Stone (Khanda, Gitti, Boulder)" Project at Gata No.- 339 Khand No.-… — environmental approval granted, 0 m away
- "Building Stone (Khanda, Gitti, Boulder)" Project at Gata No.- 339 Khand No.-… — cleared for impact study, 0 m away
- Building Stone [Khanda, Gitti, Boulder] mine — under environmental review, 50 m away
- Building Stone [Khanda, Gitti, Boulder] mine — under environmental review, 50 m away
- Proposed Project of "Building Stone as Granite (Khanda, Gitti, Boulder)"… — more information requested, 100 m away
- Proposed Project of "Building Stone as Granite (Khanda, Gitti, Boulder)"… — cleared for impact study, 100 m away
- "Building Stone or Granite Khanda, Boulder, Ballast (Gitty)" at Gata/Arazi No-… — under environmental review, 150 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.