Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Sept 2024 |
| Application filed | 23 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Berger Paints India Limited |
| Land area | 35.9 acres (14.5 ha) |
| Project cost | ₹800 crore |
| Village / locality | Sobh (Som) |
| Taluk / tehsil | Sandila |
| District | Hardoi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01396 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 23 Jul 2024 (this page) | Environmental approval granted | 35.9 acres | ₹800 crore |
| New project filed 1 Dec 2022 | Environmental approval granted | 35.9 acres | ₹800 crore |
In context
20 applications in Hardoi since January 2022 are in the same category (Industry): 14 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 35.9 acres, this one is larger than 55% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sobh (Som), Sandila, Hardoi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Integrated Paints Plant at Plot no. B4 & B5, Sandila Industrial… — environmental approval granted, 0 m away
- Expansion of Existing Integrated Paint plant with addition of Drier… — under environmental review, 0 m away
- Expansion of Existing Integrated Paint plant with addition of drier… — withdrawn, 0 m away
- Environmental Clearance of manufacturing of synthetic organic chemicals for… — cleared for impact study, 1.2 km away
- Proposed expansion of existing Distillery (Grain Based) from 66 KLD to 100 KLD… — cleared for impact study, 1.9 km away
- Environmental Clearance for Proposed Project of Manufacturing of Different… — environmental approval granted, 1.9 km away
- Environmental Clearance for Proposed Project of Manufacturing of Different… — cleared for impact study, 1.9 km away
- Expansion of Existing 55 Kld Distillery to 66 Kld Grain Based Distillery Plant… — environmental approval granted, 1.9 km away
More from Berger Paints India Limited in Hardoi
- Expansion of Existing Integrated Paint plant with addition of Drier… — under environmental review
- Expansion of Existing Integrated Paint plant with addition of drier… — withdrawn
4 Berger Paints India projects in Hardoi
All 13 Berger Paints India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.