Project details
| Official title | Construction of New District Jail (Capacity 1026) at Padrauna, District Kushinagar, Uttar Pradesh by Superintendent of District Jail, Deoria |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 May 2024 |
| Application filed | 21 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Raj Verma |
| Use | Other |
| Units | 175 |
| Floors (tallest) | 7 |
| Parking spaces | 195 |
| Land area | 65.2 acres (26.4 ha) |
| Built-up area | 37,683 m² (4,05,616 sq ft) |
| Plot area | 2,63,815 m² (28,39,678 sq ft) |
| Project cost | ₹231.6 crore |
| Village / locality | Kewal Chhapra |
| Taluk / tehsil | Piprasi |
| District | Kushinagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01408 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kewal Chhapra, Piprasi, Kushinagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Four Laning of NH-727 From Km. 0.000 to 23.810 & Two Lane With Paved Shoulder… — initial checks, 2.1 km away
- Gorakhpur Siliguri High Speed Access Controlled Corridor UP Section starting… — returned to applicant, 18.7 km away
- Greenfield, Gorakhpur Siliguri High Speed Access Controlled Highway starting… — initial checks, 19 km away
- Environmental clearance for Construction of Mahatma Buddh Technical &… — environmental approval granted, 19.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 22.4 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to BPCL… — forest land use approved, 24.6 km away
- Industrial project by M/s. Ramaya Distilleries & Bottlers Pvt. Ltd. — environmental approval granted, 31.2 km away
- Expansion of Sugar Mill (5000 TCD to 12000 TCD) by M/s. The United Provinces… — environmental approval granted, 34.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.