One of 2 filings for this project. The project's main page, with every filing and where each stands: Building Stone Sandstone, Gitti , Boulder, Patiya Mine at Arazi No 141 (Vigyapti Sl. No.…
Project details
| Official title | Building Stone Sandstone, Gitti , Boulder, Patiya Mine at Arazi No 141 (Vigyapti Sl. No. 03), Area 0.85 ha in Village- Chiraiya, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh of Shri Harsh Agrawal |
|---|---|
| Status | Cleared for impact study |
| Status since | 15 Nov 2024 |
| Application filed | 8 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Harsh agrawal |
| Land area | 12.8 acres (5.2 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Usmanpur Kachhar |
| Taluk / tehsil | Handia |
| District | Prayagraj |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01427 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Oct 2025 | Environmental approval granted | 12.8 acres | ₹1.4 crore |
| Early planning filed 8 May 2024 (this page) | Cleared for impact study | 12.8 acres | ₹1.4 crore |
In context
155 applications in Prayagraj since January 2022 are in the same category (Mining): 89 approved, 43 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 12.8 acres, this one is larger than 68% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 25.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Usmanpur Kachhar, Handia, Prayagraj, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone Sandstone, Gitti , Boulder, Patiya Mine at Arazi No 141… — environmental approval granted, 0 m away
- Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga… — returned to applicant, 0 m away
- Proposed Project of Riverbed Ordinary Sand Mining from the Riverbed of Ganga… — environmental approval granted, 0 m away
- Proposed "riverbed ordinary sand mining" having lease area - 5.0 ha along… — under environmental review, 200 m away
- Proposed "Ordinary Sand" Project at Gata No.- 01Ka Khand No.- 26, Village-… — environmental approval granted, 9.1 km away
- Environment clearance of proposed riverbed sand/morrum mining having lease… — cleared for impact study, 9.2 km away
- "Riverbed ordinary sand" mining having lease area - 5.0 ha along River Ganga… — lapsed, 10.4 km away
- Ordinary sand mining from riverbed of Tons, at Gata/Khand No. 38, Area-5.0 ha — environmental approval granted, 10.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.