Project details
| Status | Withdrawn |
|---|---|
| Status since | 26 Sept 2024 |
| Application filed | 23 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Water & irrigation |
| Applicant | Acme Cleantech Solutions Private Limited |
| Land area | 1,907.5 acres (771.9 ha) |
| Project cost | ₹2,671.8 crore |
| Village / locality | Mubarakpur |
| Taluk / tehsil | Chakia |
| District | Chandauli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01501 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 28 Oct 2024 | Cleared for impact study | 2,292.6 acres | ₹2,671.8 crore |
| Ownership transfer filed 7 Oct 2024 | Lapsed | 2,292.6 acres | ₹2,671.8 crore |
| Ownership transfer filed 23 Jul 2024 (this page) | Withdrawn | 1,907.5 acres | ₹2,671.8 crore |
| Early planning filed 1 Aug 2023 | Cleared for impact study | 2,292.6 acres | ₹2,671.8 crore |
In context
9 applications in Chandauli since January 2022 are in the same category (Water & irrigation): 2 approved, 1 filed or under review, and 6 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mubarakpur, Chakia, Chandauli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Musakhand Pumped Storage Project (600 MW) — cleared for impact study, 150 m away
- Musakhand Pumped Storage Project (600 MW) — lapsed, 150 m away
- Musakhand Pumped Storage Project (600 MW) — cleared for impact study, 150 m away
- Musakhand Pumped Storage Project (600 MW) — lapsed, 200 m away
- Musakhand Closed Loop Pumped Storage Project (600 MW) by M/s ACME Urja Two… — lapsed, 200 m away
- Musakhand Pumped Storage Project (600 MW) — lapsed, 650 m away
- Proposed Reserved Forest Land to be diverted for Road Widening at Bhabhora… — more information requested, 2 km away
- Laying of ADSS Optical Fibre Cable(aerial installation) — lapsed, 3 km away
More from Acme Cleantech Solutions Private Limited in Chandauli
- Musakhand Pumped Storage Project (600 MW) — lapsed
- Musakhand Pumped Storage Project (600 MW) — lapsed
6 Acme Cleantech Solutions projects in Chandauli
All 7 Acme Cleantech Solutions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.