One of 2 filings for this project. The project's main page, with every filing and where each stands: Area- 17.00 Ha Diaspore/ Pyrophyllite Mining project at Araji No. 1211/2, Village-…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Jan 2026 |
| Application filed | 29 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rao Raja Yadav |
| Land area | 42 acres (17 ha) |
| Project cost | ₹72 lakh |
| Village / locality | Kakrari |
| Taluk / tehsil | Mahroni |
| District | Lalitpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01538 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Jul 2026 | Environmental approval granted | 42 acres | ₹72 lakh |
| Early planning filed 29 May 2025 (this page) | Cleared for impact study | 42 acres | ₹72 lakh |
In context
75 applications in Lalitpur since January 2022 are in the same category (Mining): 59 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 42 acres, this one is larger than 92% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kakrari, Mahroni, Lalitpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Area- 17.00 Ha Diaspore/ Pyrophyllite Mining project at Araji No. 1211/2,… — environmental approval granted, 0 m away
- "Khanda-Boulder/Gitti-Ballast" Mine at Gata/Arazi No-865 Gha, Area – 1.012… — environmental approval granted, 5.1 km away
- Standalone Grinding Unit with Cement Production Capacity of 4.0 Million TPA — under environmental review, 6.5 km away
- Expansion of Lalitpur TPP by adding 2400 (3x800) MW Coal based Ultra Super… — environmental approval granted, 8.4 km away
- Expansion of Lalitpur TPP by adding 2400 (3x800) MW Coal based Ultra Super… — cleared for impact study, 8.4 km away
- Expansion of Lalitpur TPP by adding 2400 (3x800) MW Coal based Ultra Super… — returned to applicant, 8.6 km away
- "Building stone (khanda-boulder/gitti-ballast)" Mine at Gata/Arazi No-1342/3,… — environmental approval granted, 13.2 km away
- 33 KV Electric Line From 220 KV Electric Station Kalyanpura to Sahjad Dam, to… — more information requested, 18.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.