What is this project?
"Building Stone (Khanda, Boulder, Ballast)" Mining Project at Araji No. 669 मि॰ (Khand No. 36) of Area: 2.023 Ha, Village: Khailar, Tehsil: Sadar, District: Jhansi, State: Uttar Pradesh. (TOR Appraisal) is an approved mining project in Khailar, Jhansi, Uttar Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Rahul Tiwari.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 May 2025), as of 27 Nov 2026.
Where is it?
In Khailar, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 5 acres.
When was it filed?
The application was filed on 23 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 May 2025 |
| Application filed | 23 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rahul Tiwari |
| Land area | 5 acres (2 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Khailar |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01577 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Feb 2024 (this page) | Environmental approval granted | 5 acres | ₹1.5 crore |
| Early planning filed 26 Mar 2023 | Cleared for impact study | 5 acres | ₹1.5 crore |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 58% of them.
8 other mining leases have applied within 500 m of this site; together with this one they cover 46.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.
Where it is
Khailar, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Khanda, Boulder, Ballast)" Mining Project at Araji No. 669… — cleared for impact study, 0 m away
- Building Stone (Khanda, Gitti, Boulder) Sand Stone Mine, Araji number-669mi,… — environmental approval granted, 250 m away
- Building Stone (Khanda, Gitti, Boulder) Sand Stone Mine, Araji number-669mi,… — cleared for impact study, 250 m away
- Building Stone Khanda-Boulder /Gitti-Ballast Mining Project" — environmental approval granted, 250 m away
- Khailar Khanda-Boulder/ Gitti-Ballast Mining project of M/s Shri Ganesh Stone… — cleared for impact study, 350 m away
- Building Stone or Khanda, Boulder, Ballast Mining Project — more information requested, 350 m away
- Proposed Project of "Building stone as Khanda, Boulder, Ballast mining… — lapsed, 400 m away
- Building Stone (Granite) or Khanda, Gitty, Boulder, Ballast Mining Project — environmental approval granted, 450 m away
More from Rahul Tiwari in Jhansi
- Proposed Project of Building Stone (Granite) Khanda, Gitti, Boulder, Ballast… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.