What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Gautam Buddha Nagar, Uttar Pradesh

Environmental Clearance for Construction of proposed Group housing project located at Plot No. TS-02, Jaypee Greens, Wish Town, Sector – 128, Noida, Gautam Buddha Nagar, Uttar Pradesh, 201304 of M/s Max Estates 128 Private Limited

Environmental Clearance for Construction of proposed Group housing project located at Plot No. TS-02, Jaypee Greens, Wish Town, Sector – 128, Noida, Gautam Buddha Nagar, Uttar Pradesh, 201304 of M/s Max Estates 128 Private Limited is a proposed residential project in Sultanpur, Dadri, Noida, Uttar Pradesh. It plans 268 units on 10 acres. Its stated project cost is ₹551.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 May 2024).

See it on the live map All projects in Gautam Buddha Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Construction of proposed Group housing project located at…

Project details

StatusCleared for impact study
Status since9 May 2024
Application filed3 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantMax Estates 128 Private Limited
UseResidential
Units268
Land area10 acres (4.1 ha)
Built-up area1,55,695 m² (16,75,885 sq ft)
Project cost₹551.7 crore
Village / localitySultanpur
Taluk / tehsilDadri
DistrictGautam Buddha Nagar (Noida)
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01637

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Jul 2024Environmental approval granted10 acres₹551.7 crore
Early planning filed 3 May 2024 (this page)Cleared for impact study10 acres₹551.7 crore
New project filed 13 May 2023Environmental approval granted10 acres₹551.7 crore

In context

430 applications in Noida since January 2022 are in the same category (Buildings & townships): 306 approved, 90 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10 acres, this one is larger than 55% of them.

58 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sultanpur, Dadri, Noida, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

8 Max Estates projects in Noida
All 10 Max Estates projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.