Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Apr 2025 |
| Application filed | 30 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sunil Pandey |
| Land area | 68 acres (27.5 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Redi Bhusaul Ahatmali |
| Taluk / tehsil | Mau |
| District | Chitrakoot |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01714 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Dec 2024 (this page) | Environmental approval granted | 68 acres | ₹1.5 crore |
| Early planning filed 12 Sept 2023 | Cleared for impact study | 68 acres | ₹1.5 crore |
In context
116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 68 acres, this one is larger than 83% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Redi Bhusaul Ahatmali, Mau, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/S Harsh Enterprises — cleared for impact study, 0 m away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 2/1 over an area of… — under environmental review, 1.1 km away
- for "Sand/Morrum Mining at Yamuna River Bed" over and area of 10.00 at Gata… — under environmental review, 1.9 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 4.1 km away
- Proposed Project of riverbed "Sand/ Morrum Mining Project for River Bank of… — environmental approval granted, 4.9 km away
- Proposed Project of riverbed "Sand/ Morrum Mining Project for River Bank of… — under environmental review, 4.9 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — initial checks, 5.5 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 5.5 km away
More from Sunil Pandey in Chitrakoot
- for "Sand/Morrum Mining at Yamuna River Bed" over and area of 10.00 at Gata… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.