Project details
| Official title | Terms of Reference for Environment Clearance of Proposed "river Bed Ordinary Sand Mining" Having Lease Area- 8.00 Ha. Along River Bed of Yamuna at Khand No. 3, at Village – Bhilor, Tehsil- Bara, District- Allahabad, Uttar Pradesh of Ravi Shankar Shukla |
|---|---|
| Status | Environmental approval granted |
| Status since | 30 Apr 2025 |
| Application filed | 6 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ravi Shukla |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Bhilor |
| Taluk / tehsil | Bara |
| District | Prayagraj |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01741 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Mar 2024 (this page) | Environmental approval granted | 19.8 acres | ₹95 lakh |
| Early planning filed 13 Apr 2023 | Cleared for impact study | 19.8 acres | ₹95 lakh |
In context
155 applications in Prayagraj since January 2022 are in the same category (Mining): 89 approved, 43 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 19.8 acres, this one is larger than 78% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Bhilor, Bara, Prayagraj, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Terms of Reference for Environment Clearance of Proposed "river Bed Ordinary… — cleared for impact study, 0 m away
- Proposed "riverbed ordinary sand" mining having lease area - 8.0 ha along… — under environmental review, 0 m away
- "Moram Mining at Yamuna River" — environmental approval granted, 900 m away
- Ordinary Sand Mine — environmental approval granted, 2.6 km away
- Ordinary Sand Mine — cleared for impact study, 2.6 km away
- Proposed "riverbed ordinary sand mining" having lease area - 8.0 ha along… — under environmental review, 2.8 km away
- Mining project by M/s Patal Ganga Associates — lapsed, 2.8 km away
- Mining project by M/s Patal Ganga Associates — cleared for impact study, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.