What is Developing? Open the mapMap

Cleared for impact studyWater & irrigation · Sonbhadra, Uttar Pradesh

Chichlik Pumped Storage Hydro Project (1560 MW)

Chichlik Pumped Storage Hydro Project (1560 MW) is a proposed water and irrigation project in Pokharriya, Robertsganj, Sonbhadra, Uttar Pradesh. The site covers 2,198.2 acres. Its stated project cost is ₹81.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 21 Apr 2026).

See it on the live map All projects in Sonbhadra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since21 Apr 2026
Application filed29 Feb 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorWater & irrigation
ApplicantAvaada Waterbattery Private Limited
Land area2,198.2 acres (889.6 ha)
Project cost₹81.7 crore
Village / localityPokharriya
Taluk / tehsilRobertsganj
DistrictSonbhadra
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01761

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 Sept 2026Under forest review2,198.2 acres₹81.7 crore
Early planning filed 29 Feb 2024 (this page)Cleared for impact study2,198.2 acres₹81.7 crore

In context

28 applications in Sonbhadra since January 2022 are in the same category (Water & irrigation): 14 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2,198.2 acres, this one is smaller than 57% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pokharriya, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Avaada Waterbattery Private Limited in Sonbhadra

All 3 Avaada Waterbattery projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.