Quick answers
What is this project?
"Building Stone or Granite Khanda, Boulder, Ballast (Gitty) Mining Project is a proposed mining project in Chitayan, Mahoba, Uttar Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Shubham Dwivedi.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 4 Apr 2025), as of 27 Nov 2026.
Where is it?
In Chitayan, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 2 acres.
When was it filed?
The application was filed on 29 Feb 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Building Stone or Granite Khanda, Boulder, Ballast (Gitty) Mining Project
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 4 Apr 2025 |
| Application filed | 29 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shubham Dwivedi |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Chitayan |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01777 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Jan 2026 | Environmental approval granted | 2 acres | ₹1.2 crore |
| Early planning filed 29 Feb 2024 (this page) | Cleared for impact study | 2 acres | ₹1.2 crore |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2 acres, this one is smaller than 87% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 16 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Chitayan, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone or Granite Khanda, Boulder, Ballast (Gitty) Mining Project — environmental approval granted, 0 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 50 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 50 m away
- Proposed "Building Stone, (Granite Khanda, Boulder, Bailast (Gitti))" Project… — environmental approval granted, 250 m away
- Proposed "Building Stone, (Granite Khanda, Boulder, Bailast (Gitti))" Project… — cleared for impact study, 250 m away
- Transfer of Environmental Clearance of proposed project of Granite & Dolostone… — lapsed, 300 m away
- "Building Stone (Khanda, Gitti, Boulder)" Project at Gata No.- 356 Khand No.-… — cleared for impact study, 350 m away
- Building Stone As Granite Khanda, Boulder, Ballast (Gitti) Mine — cleared for impact study, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.