What is Developing? Open the mapMap

Environmental approval grantedMining · Chitrakoot, Uttar Pradesh

Proposed Silica Sand Mining Project at Khasra/Gata no. 1428 का भाग, 1429 का भाग, 1431 का भाग, 1432 का भाग, 1433 का भाग, 1434 का भाग, 1435 का भाग, 1438 का भाग, 1391 का भाग, 1389 का भाग, 1388 का भाग, 1387 का भाग, 1386 का भाग, 1385 का भाग, 1390 का भाग, Khand No. 04, Area: 37.20 Ha, Tehsil: Mau, District: Chitrakoot (U.P.). by M/s Gold Plus Glass Industry Limited

Proposed Silica Sand Mining Project at Khasra/Gata no. 1428 का भाग, 1429 का भाग, 1431 का भाग, 1432 का भाग, 1433 का भाग, 1434 का भाग, 1435 का भाग, 1438 का भाग, 1391 का भाग, 1389 का भाग, 1388 का भाग, 1387 का भाग, 1386 का भाग, 1385 का भाग, 1390 का भाग, Khand No. 04, Area: 37.20 Ha, Tehsil: Mau, District: Chitrakoot (U.P.). by M/s Gold Plus Glass Industry Limited is an approved mining project in Pardawanmustikl, Mau, Chitrakoot, Uttar Pradesh. The site covers 91.9 acres. Its stated project cost is ₹4.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 May 2025).

See it on the live map All projects in Chitrakoot

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Silica Sand Mining Project at Khasra/Gata no. 1428 का भाग, 1429 का भाग, 1431 का…

Project details

StatusEnvironmental approval granted
Status since26 May 2025
Application filed5 Apr 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantGold Plus Glass Industry Limited
Land area91.9 acres (37.2 ha)
Project cost₹4.3 crore
Village / localityPardawanmustikl
Taluk / tehsilMau
DistrictChitrakoot
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01794

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 29 May 2025Environmental approval granted91.9 acres₹4.3 crore
New project filed 5 Apr 2024 (this page)Environmental approval granted91.9 acres₹4.3 crore
Early planning filed 26 Aug 2023Cleared for impact study91.9 acres₹4.3 crore

In context

116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 91.9 acres, this one is larger than 87% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 150.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.

Where it is

Pardawanmustikl, Mau, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Gold Plus Glass Industry projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.