What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Ghaziabad, Uttar Pradesh

Proposed Residential Group Housing Project at Plot No. GH-04, Sector-5, Aditya World City, Shahpur Bamheta, Ghaziabad by M/s AAPL Projects Private Limited

Proposed Residential Group Housing Project at Plot No. GH-04, Sector-5, Aditya World City, Shahpur Bamheta, Ghaziabad by M/s AAPL Projects Private Limited is an approved residential project in Shahpur Bamheta, Ghaziabad, Uttar Pradesh. It plans 2,160 units on 5.6 acres. Its stated project cost is ₹230 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 3 Dec 2024).

See it on the live map All projects in Ghaziabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential Group Housing Project at Plot No. GH-04, Sector-5, Aditya World…

Project details

StatusEnvironmental approval granted
Status since3 Dec 2024
Application filed9 Sept 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantAapl Projects Private Limited
UseResidential
Units2,160
Height102 m
Parking spaces818
Land area5.6 acres (2.3 ha)
Built-up area1,44,904 m² (15,59,732 sq ft)
Plot area22,577 m² (2,43,017 sq ft)
Project cost₹230 crore
Village / localityShahpur Bamheta
Taluk / tehsilGhaziabad
DistrictGhaziabad
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01845

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 8 May 2025Environmental approval granted5.6 acres₹230 crore
Early planning filed 17 Jan 2025Cleared for impact study5.6 acres₹230 crore
New project filed 9 Sept 2024 (this page)Environmental approval granted5.6 acres₹230 crore

In context

154 applications in Ghaziabad since January 2022 are in the same category (Buildings & townships): 95 approved, 43 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.6 acres, this one is larger than 60% of them.

45 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Shahpur Bamheta, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Aapl Projects projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.