One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential Group Housing Project at Plot No. GH-04, Sector-5, Aditya World…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Dec 2024 |
| Application filed | 9 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Aapl Projects Private Limited |
| Use | Residential |
| Units | 2,160 |
| Height | 102 m |
| Parking spaces | 818 |
| Land area | 5.6 acres (2.3 ha) |
| Built-up area | 1,44,904 m² (15,59,732 sq ft) |
| Plot area | 22,577 m² (2,43,017 sq ft) |
| Project cost | ₹230 crore |
| Village / locality | Shahpur Bamheta |
| Taluk / tehsil | Ghaziabad |
| District | Ghaziabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01845 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 May 2025 | Environmental approval granted | 5.6 acres | ₹230 crore |
| Early planning filed 17 Jan 2025 | Cleared for impact study | 5.6 acres | ₹230 crore |
| New project filed 9 Sept 2024 (this page) | Environmental approval granted | 5.6 acres | ₹230 crore |
In context
154 applications in Ghaziabad since January 2022 are in the same category (Buildings & townships): 95 approved, 43 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.6 acres, this one is larger than 60% of them.
45 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shahpur Bamheta, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential Group Housing Project at Plot No. GH-04, Sector-5, Aditya… — environmental approval granted, 0 m away
- Proposed Residential Group Housing Project at Plot No. GH-04, Sector-5, Aditya… — cleared for impact study, 0 m away
- Proposed Group Housing Project at at Plot No. GH-3/4, Phase-1, FSI Tower-A1… — environmental approval granted, 250 m away
- Proposed Integrated Township Project '' Aditya World City'' — environmental approval granted, 300 m away
- Proposed Integrated Township Project '' Aditya World City'' — cleared for impact study, 300 m away
- Proposed Revision & Expansion of Group Housing Project "Orion Homes" at Plot… — under environmental review, 450 m away
- Proposed Residential Complex at Plot No.GH-03, Sector-06, Aditya World City… — environmental approval granted, 450 m away
- Proposed shopping mall "The Horizon Mall" at Plot No- Commercial-3 Sector –… — environmental approval granted, 650 m away
All 3 Aapl Projects projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.