Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Dec 2024 |
| Application filed | 1 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Govind |
| Land area | 3.6 acres (1.5 ha) |
| Project cost | ₹16 lakh |
| Village / locality | Manikpur Bisu |
| Taluk / tehsil | Etawah |
| District | Etawah |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01872 |
In context
21 applications in Etawah since January 2022 are in the same category (Mining): 14 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.6 acres, this one is smaller than 57% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 17.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Manikpur Bisu, Etawah, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Mining — environmental approval granted, 150 m away
- Environmental clearance of proposed ordinary soil mining at Gata Nos. 913,… — environmental approval granted, 200 m away
- proposed "Ordinary Soil Excavation Mining Project" at Gata No. 716, 717, 718,… — environmental approval granted, 800 m away
- Ordinary Soil Excavation Project — environmental approval granted, 1000 m away
- Ordinary Soil Mining Project — environmental approval granted, 1.4 km away
- Proposed "Ordinary Soil Mining Project" at Gata No.- 314/3Mi, Village-… — environmental approval granted, 2.7 km away
- Ordinary Soil Mine — environmental approval granted, 2.7 km away
- Ordinary Soil Mine Project — more information requested, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.