Quick answers
What is this project?
Proposed expansion of existing sugar unit from 9000 TCD to 18000 TCD is a lapsed industrial project in Karanpur, Gunnaur, Sambhal, Uttar Pradesh. The site covers 160.2 acres.
Who is building it?
The applicant is Arun Kumar.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Karanpur, Gunnaur, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2,500 crore and a site of 160.2 acres.
When was it filed?
The application was filed on 16 Mar 2024.
Project details
| Official title | Proposed expansion of existing sugar unit from 9000 TCD to 18000 TCD along with co gen power plant from capacity 40 MW to 65 MW and establishment of new distillery unit having capacity 500 KLD (based on Cane Juice Syrup / C or B Heavy Molasses / Grains) within sugar industry premises at Village: Rajpura, Karanpur, Rasoolpur, Chandunagla & Dohari, Tehsil: Gunnaur, District: Sambhal, Uttar Pradesh by M/S DSM Sugar Rajpura, Unit – Rajpura (A unit of Dhampur Sugar Mills Limited) |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 16 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Arun Kumar |
| Land area | 160.2 acres (64.9 ha) |
| Project cost | ₹2,500 crore |
| Village / locality | Karanpur |
| Taluk / tehsil | Gunnaur |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01884 |
In context
10 applications in Sambhal since January 2022 are in the same category (Industry): 7 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 160.2 acres, this one is larger than 60% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karanpur, Gunnaur, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of existing sugar unit from 9000 TCD to 18000 TCD by M/s… — under environmental review, 100 m away
- Expansion of existing Sugar unit from 9,000 TCD to 15,000 TCD — under environmental review, 150 m away
- Expansion of existing Sugar unit from 9,000 TCD to 15,000 TCD — cleared for impact study, 150 m away
- Industrial project by Tata Chemicals limited — environmental approval granted, 8.4 km away
- Proposed Forest Land to be Diverted for Approach Access to BPCL Retail Outlet… — lapsed, 10.3 km away
- Diversion of Protected Forest Land To Be Diverted For Entry/Exit Approach To… — under forest review, 10.3 km away
- Environmental Clearance of common Bio-medical Waste Treatment Facility (CBWTF)… — environmental approval granted, 10.3 km away
- Common Biomedical Waste Treatment Facility (CBWTF) proposed by M/s… — more information requested, 10.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.