Quick answers
What is this project?
Affordable Housing and Commercial Project by M/s Hitech Buildcon Pvt Ltd is an approved mixed-use project in Sunrakgh Bangar, Mathura, Uttar Pradesh. It plans 684 units of up to 9 floors on 7.8 acres.
Who is building it?
The applicant is Hi-Tech Buildcon Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Sept 2024), as of 27 Nov 2026.
Where is it?
In Sunrakgh Bangar, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹34.1 crore and a site of 7.8 acres.
When was it filed?
The application was filed on 10 Apr 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Sept 2024 |
| Application filed | 10 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Hi-Tech Buildcon Private Limited |
| Use | Mixed use |
| Units | 684 |
| Floors (tallest) | 9 |
| Height | 51 m |
| Parking spaces | 1,325 |
| Land area | 7.8 acres (3.2 ha) |
| Built-up area | 1,12,472 m² (12,10,637 sq ft) |
| Plot area | 31,690 m² (3,41,108 sq ft) |
| Project cost | ₹34.1 crore |
| Village / locality | Sunrakgh Bangar |
| Taluk / tehsil | Mathura |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01898 |
In context
21 applications in Mathura since January 2022 are in the same category (Buildings & townships): 6 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.8 acres, this one is larger than 71% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sunrakgh Bangar, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Group Housing Building on GH 02, at RukmaniViharAwasiyaYojna Sector… — under environmental review, 600 m away
- Laying of 125mm MDPE PNG pipeline along RHS of Vrindavan-Chhatikara Road in… — forest land use approved, 600 m away
- Proposed "Commercial Rukmani Vihar Avasiya Yojna" project at Plot no. S-3,… — lapsed, 1 km away
- Proposed "Commercial Rukmani Vihar Avasiya Yojna" project at Plot no. S-3,… — environmental approval granted, 1 km away
- Commercial Rukmani Vihar Avasiya Yojna at Plot no. S-3, Sector-03, Vrindavan… — returned to applicant, 1 km away
- Splitting of Environmental Clearance granted to M/s Hare Krishna Movement… — under environmental review, 1.4 km away
- Affordable Group Housing Project " Shri Divine Vasudha" by M/s. Shri Divine… — initial checks, 1.8 km away
- Proposed Group Housing Situated at Khasra No. - 68/ 8 M & 67, Mauza Sunrakh… — more information requested, 2.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.