Proposed Group Housing "CRC Maesta" at Plot No.-GH-11B, Sector-1, Greater Noida West , Uttar Pradesh

Proposed Group Housing "CRC Maesta" at Plot No.-GH-11B, Sector-1, Greater Noida West , Uttar Pradesh is an approved residential project in Bisrakh, Dadri, Noida, Uttar Pradesh. It plans 375 units in 5 towers of up to 33 floors on 3.7 acres. Its stated project cost is ₹405.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 11 Sept 2024).

See it on the live map All projects in Gautam Buddha Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since11 Sept 2024
Application filed3 Jun 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantComely Buildtech India Private Limited
UseResidential
Units375
Towers5
Floors (tallest)33
Basements2
Height113 m
Parking spaces829
Land area3.7 acres (1.5 ha)
Built-up area82,536 m² (8,88,409 sq ft)
Plot area14,769 m² (1,58,972 sq ft)
Project cost₹405.8 crore
Village / localityBisrakh
Taluk / tehsilDadri
DistrictGautam Buddha Nagar (Noida)
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01914

In context

430 applications in Noida since January 2022 are in the same category (Buildings & townships): 306 approved, 90 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.7 acres, this one is smaller than 81% of them.

98 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bisrakh, Dadri, Noida, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.