Project details
| Official title | Construction of Residential and Non-Residential Buildings for Veerangana Udadevi Mahila Police Reserve Battalion at Khasra No.- 2199, 2200, 2201, 2406, Village- Piparsand (Pargana- Bijnaur), Tehsil- Sarojini Nagar, District- Lucknow, Uttar Pradesh by Deputy Commandant, 32nd Battalion PAC, Lucknow, Uttar Pradesh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 4 Sept 2024 |
| Application filed | 26 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Arun Kumar Singh |
| Use | Mixed use |
| Units | 558 |
| Towers | 8 |
| Floors (tallest) | 8 |
| Parking spaces | 663 |
| Land area | 21.2 acres (8.6 ha) |
| Built-up area | 90,581 m² (9,75,005 sq ft) |
| Plot area | 85,927 m² (9,24,910 sq ft) |
| Project cost | ₹338.4 crore |
| Village / locality | Piparsand |
| Taluk / tehsil | Sadar |
| District | Lucknow |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01982 |
In context
160 applications in Lucknow since January 2022 are in the same category (Buildings & townships): 105 approved, 38 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 21.2 acres, this one is larger than 74% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Piparsand, Sadar, Lucknow, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- U.P. Special Security Force Head and 1st Battalion U.P. Special Security Force — environmental approval granted, 450 m away
- ITBP Approach Road at Village Kuroinee, Division Awadh Forest Division,… — lapsed, 2.4 km away
- ITBP Approach Road at Village Kuroinee, Division Awadh Forest Division,… — more information requested, 2.4 km away
- Ordinary Soil Mine — initial checks, 3.9 km away
- "Ordinary Soil Mining Project" — environmental approval granted, 4.1 km away
- Greenfield, Access Controlled "Agra-Lucknow Expressway to Purvanchal… — cleared for impact study, 5.2 km away
- Regularization of the existing project of Rolling Mill having capacity of M.S… — lapsed, 5.5 km away
- Forest Land Proposed for Construction of approach road — under forest review, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.