Quick answers
What is this project?
Building Stone (Sand Stone) Mining Project (Area 1.61 ha or 4.0 Acres)) is a lapsed mining project in Sonbarsa, Lalganj, Mirzapur, Uttar Pradesh. The site covers 4 acres.
Who is building it?
The applicant is Vishal Dubey.
Has it been approved?
No. The application was lapsed on 21 Aug 2025, so it is no longer under consideration.
Where is it?
In Sonbarsa, Lalganj, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 4 acres.
When was it filed?
The application was filed on 2 May 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Building Stone (Sand Stone) Mining Project (Area 1.61 ha or 4.0 Acres)
Project details
| Status | Lapsed |
|---|---|
| Status since | 21 Aug 2025 |
| Application filed | 2 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vishal Dubey |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹1 crore |
| Village / locality | Sonbarsa |
| Taluk / tehsil | Lalganj |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02057 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 2 Dec 2024 | Lapsed | 4 acres | ₹1 crore |
| Early planning filed 2 May 2024 (this page) | Lapsed | 4 acres | ₹1 crore |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4 acres, this one is larger than 61% of them.
8 other mining leases have applied within 500 m of this site; together with this one they cover 22.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Sonbarsa, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone (Sand Stone) Mining Project (Area 1.61 ha or 4.0 Acres) — lapsed, 0 m away
- "Building stone (Sandstone)" Mine at Arazi/Gata No.- 36/6/5, Lease area- 0.809… — cleared for impact study, 100 m away
- "Building stone (Sandstone)" Mine at Arazi/Gata No.- 36/6/5, Lease area- 0.809… — environmental approval granted, 100 m away
- Building stone (Sandstone) Project at Gata No.-36/6/5, Village– Sonbarsa,… — environmental approval granted, 150 m away
- "Sand Stone (Quartzite Bailast Gitti)" Project at Gata No.- 36/6/5 , Village-… — environmental approval granted, 250 m away
- "Sand Stone (Quartzite Bailast Gitti)" Project at Gata No.- 36/6/5 , Village-… — cleared for impact study, 250 m away
- "Imarati Patthar (Sandstone)" Mine at Gata No.- 36/6/5, Lease Area- 0.809 Ha,… — environmental approval granted, 400 m away
- "Imarati Patthar (Sandstone)" Mine at Gata No.- 36/6/5, Lease Area- 0.809 Ha,… — cleared for impact study, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.