What is Developing? Open the mapMap

Environmental approval grantedMining · Mirzapur, Uttar Pradesh

"Building stone (Sandstone)" Mine at Arazi/Gata No.- 1, Lease Area- 0.969 ha., Village– Dhuria, Tehsil- Chunar, District–Mirzapur, Uttar Pradesh Developed by M/s Yathartha Enterprises (Shri Surendra Pratap Singh)

"Building stone (Sandstone)" Mine at Arazi/Gata No.- 1, Lease Area- 0.969 ha., Village– Dhuria, Tehsil- Chunar, District–Mirzapur, Uttar Pradesh Developed by M/s Yathartha Enterprises (Shri Surendra Pratap Singh) is an approved mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.4 acres. Its stated project cost is ₹84 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 27 Sept 2024).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building stone (Sandstone)" Mine at Arazi/Gata No.- 1, Lease Area- 0.969 ha., Village– Dhuria, Tehsil- Chunar, District–Mirzapur, Uttar Pradesh Developed by M/s Yathartha Enterprises (Shri Surendra Pratap Singh) is an approved mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.4 acres.

Who is building it?

The applicant is Surendra Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 27 Sept 2024), as of 27 Nov 2026.

Where is it?

In Dhuria, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹84 lakh and a site of 2.4 acres.

When was it filed?

The application was filed on 19 Feb 2024.

Project details

StatusEnvironmental approval granted
Status since27 Sept 2024
Application filed19 Feb 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSurendra Singh
Land area2.4 acres (1 ha)
Project cost₹84 lakh
Village / localityDhuria
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02084

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Feb 2024 (this page)Environmental approval granted2.4 acres₹84 lakh
Early planning filed 6 Jun 2023Cleared for impact study2.4 acres₹84 lakh

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.4 acres, this one is smaller than 75% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 6.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 112 mining leases have applied within 5 km.

Where it is

Dhuria, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Surendra Singh in Mirzapur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.