What is Developing? Open the mapMap

Cleared for impact studyMining · Jhansi, Uttar Pradesh

Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project

Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project is a proposed mining project in Khailar, Jhansi, Uttar Pradesh. The site covers 5 acres. Its stated project cost is ₹96 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 31 Jan 2026).

See it on the live map All projects in Jhansi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project is a proposed mining project in Khailar, Jhansi, Uttar Pradesh. The site covers 5 acres.

Who is building it?

The applicant is Jitendra Pratap Yadav.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 31 Jan 2026), as of 27 Nov 2026.

Where is it?

In Khailar, Jhansi, Uttar Pradesh.

How big is it?

It has a stated cost of ₹96 lakh and a site of 5 acres.

When was it filed?

The application was filed on 19 Mar 2024.

Project details

StatusCleared for impact study
Status since31 Jan 2026
Application filed19 Mar 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantJitendra Pratap Yadav
Land area5 acres (2 ha)
Project cost₹96 lakh
Village / localityKhailar
Taluk / tehsilJhansi
DistrictJhansi
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02171

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 Sept 2026Under environmental review5 acres₹96 lakh
Early planning filed 19 Mar 2024 (this page)Cleared for impact study5 acres₹96 lakh

In context

211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 58% of them.

9 other mining leases have applied within 500 m of this site; together with this one they cover 48 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.

Where it is

Khailar, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jitendra Pratap Yadav in Jhansi

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.