Environmental approval grantedMining · Mahoba, Uttar Pradesh

Building Stone or Granite Khanda, Boulder, Ballast (Gitty) Mining Project

Building Stone or Granite Khanda, Boulder, Ballast (Gitty) Mining Project is an approved mining project in Bari, Mahoba, Uttar Pradesh. The site covers 2.5 acres. Its stated project cost is ₹1.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 15 May 2025).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Building Stone or Granite Khanda, Boulder, Ballast (Gitty) Mining Project is an approved mining project in Bari, Mahoba, Uttar Pradesh. The site covers 2.5 acres.

Who is building it?

The applicant is Dhaneshwar Rai.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 15 May 2025), as of 27 Nov 2026.

Where is it?

In Bari, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.1 crore and a site of 2.5 acres.

When was it filed?

The application was filed on 3 Feb 2025.

Project details

StatusEnvironmental approval granted
Status since15 May 2025
Application filed3 Feb 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantDhaneshwar Rai
Land area2.5 acres (1 ha)
Project cost₹1.1 crore
Village / localityBari
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02247

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 3 Feb 2025 (this page)Environmental approval granted2.5 acres₹1.1 crore
Early planning filed 26 Oct 2023Cleared for impact study2.5 acres₹1.1 crore

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 76% of them.

16 other mining leases have applied within 500 m of this site; together with this one they cover 43.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 42 mining leases have applied within 5 km.

Where it is

Bari, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dhaneshwar Rai in Mahoba

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.