One of 2 filings for this project. The project's main page, with every filing and where each stands: Area- 2.00 Ha Granite Dimensional Stone Mining project at Araji/ No.763/3 &763/4…
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Jun 2026 |
| Application filed | 29 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Atul Sharma |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Lalitpur |
| Taluk / tehsil | Lalitpur |
| District | Lalitpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02257 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 May 2025 (this page) | Lapsed | 4.9 acres | ₹1.3 crore |
| Early planning filed 27 Oct 2023 | Cleared for impact study | 4.9 acres | ₹1.3 crore |
In context
75 applications in Lalitpur since January 2022 are in the same category (Mining): 59 approved, 9 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is larger than 61% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Lalitpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Area- 2.00 Ha Granite Dimensional Stone Mining project at Araji/ No.763/3… — cleared for impact study, 0 m away
- "Khanda- Boulder/Gitti- Ballast Mine (Except Granite Dimensional Stone)" at… — environmental approval granted, 3.8 km away
- Building Stone, Granite Sized Dimensional Stone Mine — environmental approval granted, 6.3 km away
- Proposed Project for Mining of Building Stone or Khanda, Patiya Boulder Gitti… — environmental approval granted, 6.3 km away
- "Building stone (khanda-boulder/gitti-ballast)" Mine at Gata/Arazi No-… — environmental approval granted, 7.8 km away
- Diversion of forest land for Construction of 11KV electric line For Jamrar dam… — more information requested, 9.1 km away
- Area- 3.591 Ha Granite Dimensional Stone Mining project — under environmental review, 10.5 km away
- Area 1.9546 Ha Granite Sized Dimensional Stone Mining project at Araji/… — environmental approval granted, 10.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.