Quick answers
What is this project?
Proposed Khailar Khanda-Boulder/ Gitti- Ballast Mining Project Gata No. 669 (Khand- 08) is an approved mining project in Khailar, Jhansi, Uttar Pradesh. The site covers 6.3 acres.
Who is building it?
The applicant is Shri Harsh Yadav.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 May 2024), as of 27 Nov 2026.
Where is it?
In Khailar, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹66 lakh and a site of 6.3 acres.
When was it filed?
The application was filed on 30 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 May 2024 |
| Application filed | 30 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shri Harsh Yadav |
| Land area | 6.3 acres (2.5 ha) |
| Project cost | ₹66 lakh |
| Village / locality | Khailar |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02271 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.3 acres, this one is larger than 61% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 37.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.
Where it is
Khailar, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Khandas-Boulder /Gitti-Ballast Mining Project — environmental approval granted, 150 m away
- Proposed Project of Granite, Khanda, Boulder, Ballast Mine at Gata No 669mi,… — lapsed, 150 m away
- Proposed Project of Granite, Khanda, Boulder, Ballast Mine at Gata No 669mi,… — cleared for impact study, 150 m away
- Proposed Khailar Khanda-Boulder/ Gitti- Ballast Mining Project Gata No. 669… — environmental approval granted, 200 m away
- Building Stone (Khanda, Boulder, Ballast) Mining Project — environmental approval granted, 250 m away
- Building Stone (Khanda, Boulder, Ballast) Mining Project — cleared for impact study, 250 m away
- BUILDING STONE AS SANDSTONE KHANDA, BOULDER, BALLAST MINE AT GATA No. – 669 MI… — environmental approval granted, 350 m away
- BUILDING STONE AS SANDSTONE KHANDA, BOULDER, BALLAST MINE AT GATA No. – 669 MI… — cleared for impact study, 350 m away
More from Shri Harsh Yadav in Jhansi
- Proposed Project of Granite, Khanda, Boulder, Ballast Mine at Gata No 669mi,… — lapsed
- Proposed Project of Granite, Khanda, Boulder, Ballast Mine at Gata No 669mi,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.