Quick answers
What is this project?
Building Stone or Khanda, Boulder, Gitti, Ballast Mining Project is a proposed mining project in Dunara, Jhansi, Uttar Pradesh. The site covers 6 acres.
Who is building it?
The applicant is Virendra Pratap Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Mar 2026), as of 27 Nov 2026.
Where is it?
In Dunara, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 6 acres.
When was it filed?
The application was filed on 9 Apr 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Mar 2026 |
| Application filed | 9 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Virendra Pratap Singh |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Dunara |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-02328 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6 acres, this one is larger than 55% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 36.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 23 mining leases have applied within 5 km.
Where it is
Dunara, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Building Stone or Khanda, Gitti, Boulder Mine at Gata No… — environmental approval granted, 150 m away
- Proposed Project of Building Stone or Khanda, Gitti, Boulder Mine at Gata No… — cleared for impact study, 150 m away
- Building Stone (Granite) or Khanda, Gitti, Boulder, Ballast Mining Project — cleared for impact study, 200 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — under environmental review, 200 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 300 m away
- Building Stone (Granite) or Khanda, Boulder, Gitti, Ballast Mining — cleared for impact study, 350 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 400 m away
- Proposed Project of Building Stone (Granite) Khanda, Gitti, Boulder, Ballast… — cleared for impact study, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.