One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining at river Bed of Ganga River Khand No.-1, Gata No 1395 mi Village –…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Dec 2024 |
| Application filed | 18 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Bhoopender Singh |
| Land area | 20.5 acres (8.3 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Khajurgaon Atamali |
| Taluk / tehsil | Lalganj |
| District | Rae Bareli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02342 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Apr 2025 | Environmental approval granted | 20.5 acres | ₹60 lakh |
| Early planning filed 18 Oct 2024 (this page) | Cleared for impact study | 20.5 acres | ₹60 lakh |
In context
26 applications in Rae Bareli since January 2022 are in the same category (Mining): 21 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 20.5 acres, this one is larger than 81% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 48.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Khajurgaon Atamali, Lalganj, Rae Bareli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining at river Bed of Ganga River Khand No.-1, Gata No 1395 mi Village –… — environmental approval granted, 0 m away
- Riverbed ordinary sand" mining having lease area - 11.30 ha along River Ganga… — environmental approval granted, 450 m away
- Riverbed ordinary sand" mining having lease area - 11.30 ha along River Ganga… — cleared for impact study, 450 m away
- Proposed Forest Land to be diverted for Entry/Exit Approach to IOCL Retail… — in-principle approval, conditions pending, 9.1 km away
- Laying of 24 F OF cable from Laying of 24 F OFC from Lal Ganj By pass (Unnao… — lapsed, 14.4 km away
- Reserve Forest Land proposed to be diverted for the Construction of… — more information requested, 19.2 km away
- Laying of OFC on Unnao –Lalganj NH-31 from km 50.856 to 62.500 by HDD method… — more information requested, 19.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 20.4 km away
More from Bhoopender Singh in Rae Bareli
- Riverbed ordinary sand" mining having lease area - 11.30 ha along River Ganga… — environmental approval granted
- Riverbed ordinary sand" mining having lease area - 11.30 ha along River Ganga… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.