What is Developing? Open the mapMap

Environmental approval grantedMining · Ballia, Uttar Pradesh

"Ordinary Sand Mining" at Ghaghara River Bed at Gata No. 396/1 , Area: 11.70 Ha, Village: Takia Dharahara Khadar, Tehsil: Salempur, District: Deoria, State: Uttar Pradesh

"Ordinary Sand Mining" at Ghaghara River Bed at Gata No. 396/1 , Area: 11.70 Ha, Village: Takia Dharahara Khadar, Tehsil: Salempur, District: Deoria, State: Uttar Pradesh is an approved mining project in Haldi Rampur, Belthara Road, Ballia, Uttar Pradesh. The site covers 28.9 acres. Its stated project cost is ₹3.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 15 Mar 2024).

See it on the live map All projects in Ballia

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Ordinary Sand Mining" at Ghaghara River Bed at Gata No. 396/1 , Area: 11.70 Ha, Village: Takia Dharahara Khadar, Tehsil: Salempur, District: Deoria, State: Uttar Pradesh is an approved mining project in Haldi Rampur, Belthara Road, Ballia, Uttar Pradesh. The site covers 28.9 acres.

Who is building it?

The applicant is Mr. Raj Pratap Yadav.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 15 Mar 2024), as of 27 Nov 2026.

Where is it?

In Haldi Rampur, Belthara Road, Ballia, Uttar Pradesh.

How big is it?

It has a stated cost of ₹3.1 crore and a site of 28.9 acres.

When was it filed?

The application was filed on 15 Jan 2024.

Project details

StatusEnvironmental approval granted
Status since15 Mar 2024
Application filed15 Jan 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorMining
ApplicantMr. Raj Pratap Yadav
Land area28.9 acres (11.7 ha)
Project cost₹3.1 crore
Village / localityHaldi Rampur
Taluk / tehsilBelthara Road
DistrictBallia
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02475

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 15 Jan 2024 (this page)Environmental approval granted28.9 acres₹3.1 crore
Ownership transfer filed 10 Jan 2024Lapsed28.9 acres₹3.1 crore
Ownership transfer filed 10 Jan 2024Lapsed28.9 acres₹3.1 crore
New project filed 27 Sept 2022Environmental approval granted28.9 acres₹3.1 crore

In context

9 applications in Ballia since January 2022 are in the same category (Mining): 5 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.

No other mining lease on record has applied within 5 km of this site.

Where it is

Haldi Rampur, Belthara Road, Ballia, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.