Quick answers
What is this project?
Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project is a proposed mining project in Goramachhiya, Jhansi, Uttar Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Rajesh sahu.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Nov 2025), as of 27 Nov 2026.
Where is it?
In Goramachhiya, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 18 Apr 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Nov 2025 |
| Application filed | 18 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rajesh sahu |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Goramachhiya |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02526 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 89% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 18 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 23 mining leases have applied within 5 km.
Where it is
Goramachhiya, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone (Khanda, Boulder, Ballast) Mining Project at Aranji No. 654/3,… — environmental approval granted, 100 m away
- Building Stone (Khanda, Boulder, Ballast) Mining Project at Aranji No. 654/3,… — cleared for impact study, 100 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — more information requested, 150 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 150 m away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 200 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — lapsed, 250 m away
- "Building Stone (Khanda, Boulder, Ballast) Mining Project" at Arazi No.-… — under environmental review, 250 m away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — environmental approval granted, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.