Quick answers
What is this project?
"Building Stone , Granite or Khanda, Boulder , Ballast (Gitti), Mining Project" at Arazi No.: 60, Khand No.:07, Area: 0.809 Ha, Village: Jamala , Tehsil: Kulpahar, District: Mahoba, State: Uttar Pradesh is an approved mining project in Jamala, Kulpahar, Mahoba, Uttar Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Manoj Budholiya.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Jan 2026), as of 27 Nov 2026.
Where is it?
In Jamala, Kulpahar, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 2 acres.
When was it filed?
The application was filed on 13 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Jan 2026 |
| Application filed | 13 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Manoj Budholiya |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Jamala |
| Taluk / tehsil | Kulpahar |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02665 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Feb 2025 (this page) | Environmental approval granted | 2 acres | ₹1.4 crore |
| Early planning filed 13 Sept 2023 | Cleared for impact study | 2 acres | ₹1.4 crore |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2 acres, this one is smaller than 87% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 6.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Jamala, Kulpahar, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone , Granite or Khanda, Boulder , Ballast (Gitti), Mining… — cleared for impact study, 0 m away
- Building Stone As Granite Khanda, Boulder, Ballast (Giity) & Hilly Red Morrum… — environmental approval granted, 100 m away
- Building Stone As Granite Khanda, Boulder, Ballast (Giity) & Hilly Red Morrum… — cleared for impact study, 100 m away
- "Building Stone , Granite or Khanda, Ballast (Gitti), Boulder Mining Project" — under environmental review, 100 m away
- "building Stone (Granite), Khanda, Gitty, Boulder Mine" — environmental approval granted, 2.8 km away
- Granite and Dolostone Ballast Gitti Mining Project — under environmental review, 2.9 km away
- REMOVAL OF MORRUM From "Bhoomidhari/ Agricultural Land/Private Land" — lapsed, 6.2 km away
- Project For Laying of OFC From NH T Point Panwari to Gondi Chauraha Kulpahad… — lapsed, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.