What is Developing? Open the mapMap

Cleared for impact studyMining · Jhansi, Uttar Pradesh

Building Stone or Khanda, Gitti, Boulder Mining Project

Building Stone or Khanda, Gitti, Boulder Mining Project is a proposed mining project in Khero, Garautha, Jhansi, Uttar Pradesh. The site covers 5 acres. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 10 Jun 2025).

See it on the live map All projects in Jhansi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Building Stone or Khanda, Gitti, Boulder Mining Project?

Building Stone or Khanda, Gitti, Boulder Mining Project is a proposed mining project in Khero, Garautha, Jhansi, Uttar Pradesh. The site covers 5 acres.

Who is building it?

The applicant is Ranjeet Gupta.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 10 Jun 2025), as of 27 Nov 2026.

Where is it?

In Khero, Garautha, Jhansi, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.2 crore and a site of 5 acres.

When was it filed?

The application was filed on 7 May 2025.

Project details

StatusCleared for impact study
Status since10 Jun 2025
Application filed7 May 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRanjeet Gupta
Land area5 acres (2 ha)
Project cost₹1.2 crore
Village / localityKhero
Taluk / tehsilGarautha
DistrictJhansi
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02691

In context

211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 58% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 21 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 22 mining leases have applied within 5 km.

Where it is

Khero, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ranjeet Gupta in Jhansi

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.