Quick answers
What is this project?
"Ordinary Soil Mining" Project at Gata No.- 133मि, 185, 187. 252, 306 Village- Aitaul, Tehsil- Chandausi, District- Sambhal, U.P. (Area – 2.6406 ha). Shri Navansh Bhardwaj is an approved mining project in Aitaul, Chandausi, Sambhal, Uttar Pradesh. The site covers 6.5 acres.
Who is building it?
The applicant is Navansh bhardwaj.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Feb 2026), as of 27 Nov 2026.
Where is it?
In Aitaul, Chandausi, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹27 lakh and a site of 6.5 acres.
When was it filed?
The application was filed on 24 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Feb 2026 |
| Application filed | 24 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Navansh bhardwaj |
| Land area | 6.5 acres (2.6 ha) |
| Project cost | ₹27 lakh |
| Village / locality | Aitaul |
| Taluk / tehsil | Chandausi |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02751 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.5 acres, this one is larger than 51% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Aitaul, Chandausi, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Soil Mining Project" at Gata 3573, 3572, 3571, 3201, 3224,… — environmental approval granted, 1 km away
- Ordinary Earth excavation from Khasra/Gata Nos 59, 242, 243, 349, 710, 238mi,… — environmental approval granted, 3.7 km away
- "Ordinary Earth Mining" Project at Gata No.- 168, 172, 176, Village-… — environmental approval granted, 3.8 km away
- Environmental Clearance of Proposed Ordinary Earth excavation from Khasra/Gata… — environmental approval granted, 4 km away
- Proposed protected forest land to be diverted for Block spot by Construction… — lapsed, 5.6 km away
- Proposed protected forest land to be diverted for Block spot by Construction… — forest land use approved, 5.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 5.7 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.