"Morrum Mining Project" on the riverbed of River Betwa at Khand No. 25/17, Gata No.- 04/1, 01, Mining Lease Area 12.145 hectares is a proposed mining project in Ichhaura, Sarila, Hamirpur, Uttar Pradesh. The site covers 30 acres.
Who is building it?
The applicant is Reva Sugar Industries Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Ichhaura, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹99 lakh and a site of 30 acres.
When was it filed?
The application was filed on 25 Sept 2025.
Project details
| Official title | "Morrum Mining Project" on the riverbed of River Betwa at Khand No. 25/17, Gata No.- 04/1, 01, Mining Lease Area 12.145 hectares situated in Village-Ichchaura, Tehsil- Sarila & District- Hamirpur, Uttar Pradesh, M/s Reva Sugar Industries Pvt. Ltd. Director-Rasmeet Singh Malhotra |
|---|---|
| Status | Under environmental review |
| Status since | 3 Nov 2026 |
| Application filed | 25 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Reva Sugar Industries Private Limited |
| Land area | 30 acres (12.2 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Ichhaura |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02774 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30 acres, this one is smaller than 87% of them.
No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.
Where it is
Ichhaura, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Morrum Mining Project — environmental approval granted, 450 m away
- Morrum Mining Project — cleared for impact study, 450 m away
- "Morrum Mining Project" on the riverbed of River Betwa at Khand No. 25/12,… — under environmental review, 650 m away
- MORRUM MININIG PROJECT — cleared for impact study, 900 m away
- Sand/ Morrum Mining Project at Betwa River Khand No. – 25/20 Village:… — environmental approval granted, 1.4 km away
- Sand/ Morrum Mining Project at Betwa River Khand No. – 25/20 Village:… — cleared for impact study, 1.4 km away
- Proposed Project of riverbed "Morrum Mining Project" on the riverbed of River… — under environmental review, 1.6 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Ichora Jitkari, (Khand… — environmental approval granted, 2.1 km away
More from Reva Sugar Industries Private Limited in Hamirpur
- Proposed Project of riverbed "Morrum Mining Project" on the riverbed of River… — under environmental review
All 6 Reva Sugar Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.