Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Apr 2026 |
| Application filed | 24 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Rudra Infrasolutions LLP |
| Use | Residential |
| Units | 316 |
| Towers | 2 |
| Floors (tallest) | 14 |
| Basements | 1 |
| Height | 45 m |
| Parking spaces | 319 |
| Land area | 2.2 acres (0.9 ha) |
| Built-up area | 34,061 m² (3,66,629 sq ft) |
| Plot area | 8,824 m² (94,981 sq ft) |
| Project cost | ₹73 crore |
| Village / locality | Mau |
| Taluk / tehsil | Mohanlalganj |
| District | Lucknow |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02808 |
In context
160 applications in Lucknow since January 2022 are in the same category (Buildings & townships): 105 approved, 38 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.2 acres, this one is smaller than 70% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mau, Mohanlalganj, Lucknow, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — more information requested, 2.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — lapsed, 5 km away
- Proposed Expansion Project of Common Bio Medical Waste Treatment facility for… — environmental approval granted, 5.1 km away
- Proposed Mini Township — environmental approval granted, 5.2 km away
- Proposed reserved forest Land to be diverted for Construction of Connecting… — in-principle approval, conditions pending, 5.4 km away
- Proposed Forest Land to be diverted for Construction of Road — lapsed, 5.4 km away
- "Ordinary Earth Mining" Project at Gata No.- 97, 39, 40, Village- Jabarauli,… — environmental approval granted, 5.5 km away
- Proposed "Hi-Tech Township" by M/s Omaxe Garv Buildtech Pvt. Ltd — environmental approval granted, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.