Quick answers
What is this project?
Proposed Project of "Ordinary Sand Mine Category-1" Gata No. 12, Village – Katari Durgapur, Tehsil – Bilhaur, District: Kanpur Nagar (U.P.)M/S Gauri Enterprises Prop. Ashok Kumar Singh,Proposed Project of "Ordinary Sand Mine Category-1" Gata No. 12, Total Lease Area – 12.0 Ha. Village – Katari Durgapur, Tehsil – Bilhaur, District: Kanpur Nagar (U.P.)Total Lease Area – 12.0 Ha is a proposed mining project in Katari Durgapur, Bilhaur, Kanpur Nagar, Uttar Pradesh. The site covers 29.7 acres.
Who is building it?
The applicant is Ashok Kumar Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Jul 2026), as of 27 Nov 2026.
Where is it?
In Katari Durgapur, Bilhaur, Kanpur Nagar, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 29.7 acres.
When was it filed?
The application was filed on 6 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of "Ordinary Sand Mine Category-1" Gata No. 12, Village – Katari…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Jul 2026 |
| Application filed | 6 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ashok Kumar Singh |
| Land area | 29.7 acres (12 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Katari Durgapur |
| Taluk / tehsil | Bilhaur |
| District | Kanpur Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02922 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Aug 2026 | Environmental approval granted | 29.7 acres | ₹85 lakh |
| Early planning filed 6 Sept 2025 (this page) | Cleared for impact study | 29.7 acres | ₹85 lakh |
In context
10 applications in Kanpur Nagar since January 2022 are in the same category (Mining): 10 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 29.7 acres, this one is smaller than 80% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Katari Durgapur, Bilhaur, Kanpur Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Ordinary Sand Mine Category-1" Gata No. 12, Village –… — environmental approval granted, 0 m away
- "Expansion of Rama Medical College, Hospital and Research Centre from 720 to… — returned to applicant, 13.9 km away
- Proposed Group Housing Project "RUDRA GARDENIA (PHASE-1)" at Arazi No. 353 &… — more information requested, 17.6 km away
- Terms of Reference application for integrated township "Mantora Green City" — cleared for impact study, 18.8 km away
- Proposed "Anand Eco Green" at Arazi No. 177,178,193,195,174 KHA,… — environmental approval granted, 19.1 km away
- Proposed "Anand Resort" At Arazi No. 560,379,578,577,573,572,570,602,603,609,61… — under environmental review, 19.2 km away
- AISHWARYA AWAS PRIVATE LIMITED(Land Development - Residential) — lapsed, 19.2 km away
- Anand Eco Green — lapsed, 20 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.