Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Feb 2026 |
| Application filed | 3 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Surjeet Patel |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹11 lakh |
| Village / locality | Raipur |
| Taluk / tehsil | Gola Gokaran Nath |
| District | Kheri |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03022 |
In context
56 applications in Kheri since January 2022 are in the same category (Mining): 37 approved, 15 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.9 acres, this one is smaller than 96% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 17 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Raipur, Gola Gokaran Nath, Kheri, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Soil Excavation" Area: 1.3436 Ha. Project at Gata No.– 37,… — initial checks, 200 m away
- "Ordinary Soil Mining" Project at Gata No: -1235, 1234, 1105, 1108, 1107,… — under environmental review, 250 m away
- "Ordinary Earth Mining" Project at Gata No.- 74क, 75क, 76, 77, 79, Village:… — environmental approval granted, 250 m away
- "Ordinary Soil Mining" Project at Gata No.- 74क, Village: -Raipur, Tehsil-… — environmental approval granted, 300 m away
- Kodri Soil Mining Project — under environmental review, 750 m away
- Golabahar Soil Mining Project — initial checks, 8 km away
- Four lane Gola Flyover at Km. 99.850 of NH-730 (Major Junction with State… — under forest review, 10.3 km away
- Expansion of existing distillery unit capacity from 100 KLD to 500 KLD (Based… — cleared for impact study, 11 km away
More from Surjeet Patel in Kheri
- "Ordinary Soil Mining" Project at Gata No: -1235, 1234, 1105, 1108, 1107,… — under environmental review
- "Ordinary Soil Mining" Project at Gata No: -2752, 3000, Village: -Grant No-11,… — environmental approval granted
- "Ordinary Soil Mining" Project at Gata No.- 74क, Village: -Raipur, Tehsil-… — environmental approval granted
- "Ordinary Earth Mining" Project at Gata No.- 74क, 75क, 76, 77, 79, Village:… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.