Quick answers
What is this project?
"Ordinary Soil Mining" Project at Gata No.- 470, 471, 478, 480, 511, 512, 517, 523, Village- Pura, Tehsil- Chandausi, District-Sambhal, U.P. (Area – 3.1344 ha). Shri Gyanedra Kumar Singh is an approved mining project in Pura, Chandausi, Sambhal, Uttar Pradesh. The site covers 7.7 acres.
Who is building it?
The applicant is Gyanedra Kumar Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Jan 2026), as of 27 Nov 2026.
Where is it?
In Pura, Chandausi, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹21 lakh and a site of 7.7 acres.
When was it filed?
The application was filed on 4 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Jan 2026 |
| Application filed | 4 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gyanedra Kumar Singh |
| Land area | 7.7 acres (3.1 ha) |
| Project cost | ₹21 lakh |
| Village / locality | Pura |
| Taluk / tehsil | Chandausi |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03080 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.7 acres, this one is larger than 61% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 13.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Pura, Chandausi, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining" Project at Gata No.- 451, 455, 456, 458, 459, 468, 473,… — under environmental review, 200 m away
- "no Increase in Pollution Load Certificate" for Proposed Expansion of Existing… — initial checks, 1.1 km away
- Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — in-principle approval, conditions pending, 1.3 km away
- Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — lapsed, 1.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to Residential… — lapsed, 1.3 km away
- Environmental Clearance of Proposed Ordinary Earth excavation from Khasra/Gata… — environmental approval granted, 2 km away
- Ordinary Earth excavation from Khasra/Gata Nos 59, 242, 243, 349, 710, 238mi,… — environmental approval granted, 2.4 km away
- "Ordinary Earth Mining" Project at Gata No.- 168, 172, 176, Village-… — environmental approval granted, 2.4 km away
More from Gyanedra Kumar Singh in Sambhal
- "Ordinary Soil Mining" Project at Gata No.- 404, 433, 396, 392, 399, Village-… — environmental approval granted
- "Ordinary Earth Mining" Project at Gata No.- 168, 172, 176, Village-… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.