Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Nov 2025 |
| Application filed | 4 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ganpati Infratech |
| Use | Residential |
| Units | 217 |
| Towers | 3 |
| Floors (tallest) | 18 |
| Basements | 1 |
| Height | 61 m |
| Parking spaces | 257 |
| Land area | 2.6 acres (1.1 ha) |
| Built-up area | 17,356 m² (1,86,818 sq ft) |
| Plot area | 10,520 m² (1,13,236 sq ft) |
| Project cost | ₹62.5 crore |
| Village / locality | Katesar |
| Taluk / tehsil | Chandauli |
| District | Chandauli |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03092 |
In context
9 applications in Chandauli since January 2022 are in the same category (Buildings & townships): 6 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Katesar, Chandauli, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Link / Connector Corridor between National Highway-19 (NH-19) and Varanasi… — under environmental review, 100 m away
- Link / Connector Corridor between National Highway-19 (NH-19) and Varanasi… — under environmental review, 150 m away
- Link / Connector Corridor between National Highway-19 (NH-19) and Varanasi… — more information requested, 150 m away
- Proposed "Twin Tower" Group Housing at Arazi No. 45/1, 47/1, 47/2, 47/3 ,Mauza… — withdrawn, 350 m away
- Proposed "Twin Tower" Group Housing at Arazi No. 45/1, 47/1, 47/2, 47/3 ,Mauza… — environmental approval granted, 350 m away
- Multi-Modal Logistics Park (MMLP) — returned to applicant, 5.1 km away
- Multi-Modal Logistics Park (MMLP) — more information requested, 5.3 km away
- Expansion of Hotel Building at Arazi No.-880/2, 883,882/2,Mauza–Aktha,Ward-Sarn… — environmental approval granted, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.