Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Mar 2026 |
| Application filed | 2 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Crosslay Remedies Limited |
| Use | Hospital |
| Units | 204 |
| Towers | 1 |
| Floors (tallest) | 10 |
| Basements | 3 |
| Height | 45 m |
| Parking spaces | 188 |
| Land area | 4,000 m² |
| Built-up area | 25,482 m² (2,74,286 sq ft) |
| Plot area | 4,000 m² (43,056 sq ft) |
| Project cost | ₹122 crore |
| Village / locality | M a K a N P U R |
| Taluk / tehsil | Ghaziabad |
| District | Ghaziabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03109 |
In context
154 applications in Ghaziabad since January 2022 are in the same category (Buildings & townships): 95 approved, 43 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 97% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
M a K a N P U R, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Max Super Specialty Hospital (A Unit of Crosslay… — initial checks, 100 m away
- Proposed Group Housing Project "Shiksha Vihar Sehkari Avas Samiti Ltd."… — initial checks, 1.3 km away
- Proposed Group Housing Project "Shiksha Vihar Sehkari Avas Samiti Ltd."… — under environmental review, 1.3 km away
- Proposed Group Housing Project at Plot No. 28, Sector-4, Vaishali, Ghaziabad… — environmental approval granted, 1.5 km away
- Proposed UPSRTC Kaushambi Bus Port cum Commercial Complex project at Plot No.… — under environmental review, 1.9 km away
- Regularization of existing production facilities for 0.91 MTPA Cold rolled… — environmental approval granted, 2 km away
- Proposed Commercial Office Building Project by M/s Radha Madhav Infratech Pvt.… — environmental approval granted, 2.3 km away
- Proposed Institutional Building Project at Plot No. A-2, Sector-62, Noida,… — environmental approval granted, 2.3 km away
More from Crosslay Remedies Limited in Ghaziabad
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.