Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Apr 2025 |
| Application filed | 6 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ranveer Yadav |
| Land area | 12.1 acres (4.9 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Sakhaura |
| Taluk / tehsil | Hardoi |
| District | Hardoi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03120 |
In context
22 applications in Hardoi since January 2022 are in the same category (Mining): 11 approved, 11 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 12.1 acres, this one is larger than 91% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Sakhaura, Hardoi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Soil Mining Project" at Gata No.- 303/2, 713/3, 538/1, 564,… — under environmental review, 950 m away
- proposed "Soil Excavation Project" at Gata No. 90, 56,150,144, Mining Lease… — environmental approval granted, 1.5 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 11.4 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — in-principle approval, conditions pending, 11.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 14 km away
- Proposed forest land to be diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 20.7 km away
- Proposed Protected Forest Land To Be Diverted For Entry And Exit To Hindustan… — lapsed, 20.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 21 km away
More from Ranveer Yadav in Hardoi
- Ordinary Earth Excavation Project at Gata No.- 104सं., 104मि., 104मि., 104मि.,… — under environmental review
- proposed "Soil Excavation Project" at Gata No. 90, 56,150,144, Mining Lease… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.