What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Ghaziabad, Uttar Pradesh

Proposed Group Housing Project at Khasra No.1014m, 1015m, 1018m, 1019, 1020, Village- Noor Nagar, Raj Nagar Extension, Tehsil & District - Ghaziabad (U.P.) by M/s Oxy Homez Developers LLP.

Proposed Group Housing Project at Khasra No.1014m, 1015m, 1018m, 1019, 1020, Village- Noor Nagar, Raj Nagar Extension, Tehsil & District - Ghaziabad (U.P.) by M/s Oxy Homez Developers LLP is a proposed residential project in Morti, Ghaziabad, Uttar Pradesh. It plans 675 units in 4 towers of up to 15 floors on 5.1 acres. Its stated project cost is ₹350 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 Apr 2026).

See it on the live map All projects in Ghaziabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Group Housing Project at Khasra No.1014m, 1015m, 1018m, 1019, 1020, Village-…

Project details

StatusCleared for impact study
Status since29 Apr 2026
Application filed14 Oct 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantOxy Homez Developers LLP
UseResidential
Units675
Towers4
Floors (tallest)15
Basements2
Height51 m
Parking spaces940
Land area5.1 acres (2.1 ha)
Built-up area1,56,972 m² (16,89,631 sq ft)
Plot area20,477 m² (2,20,412 sq ft)
Project cost₹350 crore
Village / localityMorti
Taluk / tehsilGhaziabad
DistrictGhaziabad
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03144

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 May 2026Environmental approval granted5.1 acres₹350 crore
Early planning filed 14 Oct 2025 (this page)Cleared for impact study5.1 acres₹350 crore

In context

154 applications in Ghaziabad since January 2022 are in the same category (Buildings & townships): 95 approved, 43 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.1 acres, this one is larger than 55% of them.

32 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Morti, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Oxy Homez Developers LLP in Ghaziabad

All 3 Oxy Homez Developers projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.